Categories
PROJECTS

Hydro-Mechanical Numerical Modelling for Design of Excavation and Support operation in the Tabriz Subway Tunnel Project Hydro-Mechanical Numerical Modelling for Design of Excavation and Support operation in the Tabriz Subway Tunnel Project

Numerical Design of Tabriz Subway Tunnel Project

Date of Implementation: April 2020 – November 2020

Description of operation: Hydro-Mechanical Numerical Modelling for Design of Excavation and Support operation in the Tabriz Subway Tunnel Project

Leave a Reply

Your email address will not be published. Required fields are marked *